Home
Figures
Sketch of the TERI-designed furnace (Figure 1.1a)
Schematic of the TERI designed furnace (Figure 1.1b)
Layout of a typical TERI-designed furnace (Figure 1.2a)
Layout of a typical TERI-designed furnace (Figure 1.2b)
Layout of a typical TERI designed furnace (Figure 1.2c)
View of furnace base - Plan (Figure 1.3a)
View of furnace base - elevation - Plan (Figure 1.3b)
View of furnace base - section (Figure 1.3c)
Construction of centre pit and garam nali in furnace base (Figure 1.4)
View of the tri area (Figure 1.5a)
Complete layout of the tri area (Figure 1.5b)
Flue path lay out (Figure 1.6)
Details of flue path - plan (Figure 1.7a)
(Figure 1.8)
Construction details of chimney base (Figure 1.9a)
View of metallic chimney (Figure 1.9b)
Views of crown (Figure 2.1)
Tie rod layout (Figure 2.2a)
Tie rod layout (Figure 2.2b)
Tie rod layout (Figure 2.2c)
Red brick structure (Figure 2.3)
Centre portion of the brick structure packed with wooden planks (Figure 2.4)
Mud filling in progress (Figure 2.5)
Levelling in progress (Figure 2.6)
Plastering and levelling (Figure 2.7)
Block-cutting for skewback (Figure 2.8)
Isometric view of skewback (Figure 2.9)
Dimensional drawings of skewback (Figure 2.10)
Brick- cutting machine (Figure 2.11)
Manual cutting of central burner block (Figure 2.12)
Dimensions of the burner block (Figure 2.13)
Fixing of IS 8/ silica bricks (Figure 2.14)
One half of the cut brick for thermo-well (Figure 2.15)
Fixing of centre block (Figure 2.16)
Fixing of key bricks (Figure 2.17)
Top view of completed crown (Figure 2.18)
Schematic of air train (Figure 3.1)
General arrangement of recuperator assembly (Figure 3.2a)
Air and flue gas flows in recuperator (Figure 3.2b)
Schematic of gas train (Figure 4.1)
Platform for burner (Figure 5.1)
Location of dampers (Figure 6.1a)
Location of dampers (Figure 6.1b)